The Bricker & Eckler LLP
Construction Document System
For Small and Mid-Size Projects
By: The Bricker & Eckler LLP Construction Law Group
Reprinted from June 2008 Brickerconstructionlaw.com
Highlights: In May 2008 Bricker & Eckler LLP published its
20 Rules for Public Owners’ Contracting Success. This month we
announce a new service available to public owners. This article spotlights the Bricker & Eckler LLP Construction Document System for small and mid-size projects.
The Construction Document System provides public owners with contract documents, training, and key updates designed to comply with changes in the law.
Bricker & Eckler’s 20 Rules for Public Owners’ Contracting Success
Public owners are constantly challenged in getting their projects done on time, on budget, and with good quality. Bricker & Eckler LLP recognizes these challenges and last month published its “20 Rules for Public Owners’ Contracting Success.” The “20 Rules,” which are generally listed in chronological order of their applicability, provide Public Owners with a disciplined and systematic framework for consistently contracting success.
Rule No. 13. Rule No. 13 of the “20 Rules” states a needed element for every project:
Use contracts that protect your interests and that are consistent with your expectations.
Have your contracts, including owner-architect agreement, owner-construction manager agreement, and owner-contractor agreement, drafted to protect you.
Recognizing and responding to the need for public owners to have good contracts that protect their interests, Bricker & Eckler LLP developed the Bricker & Eckler LLP Construction Document System for small and mid-size projects. The System, which consists of more than 20 documents, training, and updates, is intended to level the playing field, reward good contractors, and protect public owners from those contractors that do not do quality work and seek to make their profit from unwarranted change orders and claims. For an additional service, the Document System can be adapted quickly for larger, more complex projects.
Specifically, the System includes:
Two families of front end construction documents, one for infrastructure or engineer-led projects and one for building or architect-led projects;
Training in the use of these documents; and
Periodic updates.
A Common Problem
All too often, public owners use contract documents that either represent a series of patches added to a base set over time or form documents drafted by the design professionals association. As a result the documents often are uncoordinated and frequently fail to meet the requirements in the Ohio Revised Code. The Documents in the Bricker & Eckler LLP Construction Document System are coordinated and drafted to meet the requirements in the Ohio Revised Code. Just as important, the System is dynamic with updates designed to comply with changes in the law.
The Need for Training
Good documents go a long way in helping public owners meets the challenges they face. But public owners and their representatives need more. They need to understand the documents and how to use them.
An essential part of the Document System is training designed to educate public owners and their representatives about the Documents and how to use them. Public owners who become Document System clients may have two people attend one of the Bricker & Eckler LLP Construction Document System Seminars at the greatly reduced rate of $30.00 per person and an additional five persons attend at the reduce rate of $125.00 per person.
Some of the Features of the Documents
The Documents include copyrighted features that Bricker & Eckler LLP has developed to protect its clients. These features include Bricker & Eckler LLP’s:
Statement of Claim form designed to give public owners clear warning of any claims
Incorporation of the Federal False Claims Act standard into the Contract Documents so public owners have false claims remedies
An additional table for liquidated damages applicable to final completion
New Design Professional’s Certificate of Substantial Completion designed to identify public owners’ rights to liquidated damages and provides a summary of any notices of claims submitted by contractors
Indemnification clause designed to protect public owners from Contractors’ Claims
Payment Application Checklist and accompanying documentation, including the new Contractor’s Waiver and Release Agreement
Detailed scheduling requirements for the “Coordinating Contractor”
Specific remedies for defective and non-conforming work, including the right to recover attorneys’ fees
New weather delay table
As public owners face new challenges, additional features will be added to meet these challenges.
What Documents Are Included?
Each family of Documents, i.e., the Infrastructure and the Building Documents, include the following:
|
Legal Notice (Advertisement)
|
Notice to Proceed
|
|
Instructions to Bidders
|
General Conditions of the Construction Contract, with modifications (EJCDC C-700 or AIA A201-1997)
|
|
Bid Form
|
Contractor’s Payment Application Checklist
|
|
Bid Guaranty and Contract Bond
|
Contractor’s Affidavit With List Of Subcontractors And Suppliers With Any Amounts Withheld
|
|
Contract Bond
|
Contractor’s Waiver & Release Agreement and Subcontractors – Suppliers Waiver & Release Agreement
|
|
Contractor’s Qualification Statement
|
Statement of Claim Form
|
|
Contractor’s Personal Property Tax Affidavit
|
Notice of Commencement for the Construction Project
|
|
Terrorist Declaration Form and Exclusion List
|
Escrow Agreement
|
|
Owner-Contractor Agreement
|
State of Ohio Department of Taxation Sales and Use Tax Construction Contract Exemption Certificate
|
|
Notice of Award of Contract Sent to Surety and Surety’s Agent
|
Design Professional’s Certificate of Substantial Completion
|
What Does a Public Owner Pay for the Benefit of Using the Bricker & Eckler Construction Document System?
The initial annual fee for one family of documents, the training, and updates is $3,500.00
The initial annual fee for both families of documents, the training, and updates is $6,500.00
For subsequent years (subject to annual adjustments), renewal fees will be reduced to $2,500.00 for one family of documents and $5,000.00 for both families of documents
For charter municipalities, there is a one-time charter review fee of $500.00
How Can a Public Owner Become a Bricker & Eckler LLP Construction Document System Client?
Contact one of the following members of our Construction Department Team
Subject to a conflicts of interest check, return an executed engagement letter with the appropriate fee and tax exemption certificate
|
Political Subdivision
|
Contact
|
Phone #
|
E-Mail
|
|
Municipal
|
Jack Rosati, Esq.
E. Rod Davisson, Esq.
Doug Shevelow, Esq., P.E.
|
614-227-2321
614-227-2377
614-227-4803
|
jrosati@bricker.com
rdavisson@bricker.com
dshevelow@bricker.com
|
|
Counties
|
Samuel Wampler, Esq.
Christopher McCloskey, Esq. B.S.C.E.
Andrew Balcar, Esq.. B.S.C.E.
|
614-227-4889
614-227-2385
614-227-8873
|
swampler@bricker.com
cmccloskey@bricker.com
abalcar@bricker.com
|
|
Schools
|
Sylvia Lynn Gillis, Esq.
Scott Davis, Esq., B.S.C.E.
Matt Warnock, Esq.
|
614-227-2353
614-227-4879
614-227-2388
|
sgillis@bricker.com
sdavis@bricker.com.com
mwarnock@bricker.com
|
|
Water and Sewer Districts
|
Mark Evans, Esq., P.E.
Desmond Cullimore, P.E.
|
513-870-6680
614-227-4837
|
mevans@bricker.com
dcullimore@bricker.com
|
|
Townships
|
Kimberly Brown, Esq.
Benjamin Hyden, Esq., B.S.C.E.
David Riddle, P.E.
|
614-227-8894
513-870-6575
614-227-8814
|
kbrown@bricker.com
bhyden@bricker.com
driddle@bricker.com
|
|
Libraries
|
Sylvia Lynn Gillis, Esq.
Scott Davis, Esq., B.S.C.E.
|
614-227-2353
614-227-4879
|
sgillis@bricker.com
sdavis@bricker.com
|
|
Overall Coordination
|
Sylvia Lynn Gillis, Esq.
Michael S. Holman, Esq.
|
614-227-2353
614-227-2348
|
sgillis@bricker.com
mholman@bricker.com
|