The Bricker & Eckler LLP Construction Document System
For Small and Mid-Size Projects

By: The Bricker & Eckler LLP Construction Law Group

Reprinted from June 2008 Brickerconstructionlaw.com

Highlights:   In May 2008 Bricker & Eckler LLP published its 20 Rules for Public Owners’ Contracting Success. This month we announce a new service available to public owners. This article spotlights the Bricker & Eckler LLP Construction Document System for small and mid-size projects. The Construction Document System provides public owners with contract documents, training, and key updates designed to comply with changes in the law.

Bricker & Eckler’s 20 Rules for Public Owners’ Contracting Success

Public owners are constantly challenged in getting their projects done on time, on budget, and with good quality. Bricker & Eckler LLP recognizes these challenges and last month published its “20 Rules for Public Owners’ Contracting Success.” The “20 Rules,” which are generally listed in chronological order of their applicability, provide Public Owners with a disciplined and systematic framework for consistently contracting success.

Rule No. 13. Rule No. 13 of the “20 Rules” states a needed element for every project:

Use contracts that protect your interests and that are consistent with your expectations. Have your contracts, including owner-architect agreement, owner-construction manager agreement, and owner-contractor agreement, drafted to protect you.

Recognizing and responding to the need for public owners to have good contracts that protect their interests, Bricker & Eckler LLP developed the Bricker & Eckler LLP Construction Document System for small and mid-size projects. The System, which consists of more than 20 documents, training, and updates, is intended to level the playing field, reward good contractors, and protect public owners from those contractors that do not do quality work and seek to make their profit from unwarranted change orders and claims. For an additional service, the Document System can be adapted quickly for larger, more complex projects.

Specifically, the System includes:

  • Two families of front end construction documents, one for infrastructure or engineer-led projects and one for building or architect-led projects;

  • Training in the use of these documents; and

  • Periodic updates.

  • A Common Problem

    All too often, public owners use contract documents that either represent a series of patches added to a base set over time or form documents drafted by the design professionals association. As a result the documents often are uncoordinated and frequently fail to meet the requirements in the Ohio Revised Code. The Documents in the Bricker & Eckler LLP Construction Document System are coordinated and drafted to meet the requirements in the Ohio Revised Code. Just as important, the System is dynamic with updates designed to comply with changes in the law.

    The Need for Training

    Good documents go a long way in helping public owners meets the challenges they face. But public owners and their representatives need more. They need to understand the documents and how to use them.

    An essential part of the Document System is training designed to educate public owners and their representatives about the Documents and how to use them. Public owners who become Document System clients may have two people attend one of the Bricker & Eckler LLP Construction Document System Seminars at the greatly reduced rate of $30.00 per person and an additional five persons attend at the reduce rate of $125.00 per person.

    Some of the Features of the Documents

    The Documents include copyrighted features that Bricker & Eckler LLP has developed to protect its clients. These features include Bricker & Eckler LLP’s:

    • Statement of Claim form designed to give public owners clear warning of any claims

    • Incorporation of the Federal False Claims Act standard into the Contract Documents so public owners have false claims remedies

    • An additional table for liquidated damages applicable to final completion

    • New Design Professional’s Certificate of Substantial Completion designed to identify public owners’ rights to liquidated damages and provides a summary of any notices of claims submitted by contractors

    • Indemnification clause designed to protect public owners from Contractors’ Claims

    • Payment Application Checklist and accompanying documentation, including the new Contractor’s Waiver and Release Agreement

    • Detailed scheduling requirements for the “Coordinating Contractor”

    • Specific remedies for defective and non-conforming work, including the right to recover attorneys’ fees

    • New weather delay table

    As public owners face new challenges, additional features will be added to meet these challenges.

    What Documents Are Included?

    Each family of Documents, i.e., the Infrastructure and the Building Documents, include the following:


    Legal Notice (Advertisement)


    Notice to Proceed

    Instructions to Bidders

    General Conditions of the Construction Contract, with modifications (EJCDC C-700 or AIA A201-1997)

    Bid Form

    Contractor’s Payment Application Checklist

    Bid Guaranty and Contract Bond

    Contractor’s Affidavit With List Of Subcontractors And Suppliers With Any Amounts Withheld

    Contract Bond

    Contractor’s Waiver & Release Agreement and Subcontractors – Suppliers Waiver & Release Agreement

    Contractor’s Qualification Statement

    Statement of Claim Form

    Contractor’s Personal Property Tax Affidavit

    Notice of Commencement for the Construction Project

    Terrorist Declaration Form and Exclusion List

    Escrow Agreement

    Owner-Contractor Agreement

    State of Ohio Department of Taxation Sales and Use Tax Construction Contract Exemption Certificate

    Notice of Award of Contract Sent to Surety and Surety’s Agent

    Design Professional’s Certificate of Substantial Completion


    What Does a Public Owner Pay for the Benefit of Using the Bricker & Eckler Construction Document System?

    • The initial annual fee for one family of documents, the training, and updates is $3,500.00

    • The initial annual fee for both families of documents, the training, and updates is $6,500.00

    • For subsequent years (subject to annual adjustments), renewal fees will be reduced to $2,500.00 for one family of documents and $5,000.00 for both families of documents

    • For charter municipalities, there is a one-time charter review fee of $500.00

    How Can a Public Owner Become a Bricker & Eckler LLP Construction Document System Client?

    • Contact one of the following members of our Construction Department Team

    • Subject to a conflicts of interest check, return an executed engagement letter with the appropriate fee and tax exemption certificate

    Political Subdivision

    Contact

    Phone #

    E-Mail

    Municipal

    Jack Rosati, Esq.
    E. Rod Davisson, Esq.
    Doug Shevelow, Esq., P.E.

    614-227-2321
    614-227-2377
    614-227-4803

    jrosati@bricker.com
    rdavisson@bricker.com
    dshevelow@bricker.com

    Counties

    Samuel Wampler, Esq.
    Christopher McCloskey, Esq. B.S.C.E.
    Andrew Balcar, Esq.. B.S.C.E.

    614-227-4889
    614-227-2385
    614-227-8873

    swampler@bricker.com
    cmccloskey@bricker.com
    abalcar@bricker.com

    Schools

    Sylvia Lynn Gillis, Esq.
    Scott Davis, Esq., B.S.C.E.
    Matt Warnock, Esq.

    614-227-2353
    614-227-4879
    614-227-2388

    sgillis@bricker.com
    sdavis@bricker.com.com
    mwarnock@bricker.com

    Water and Sewer Districts

    Mark Evans, Esq., P.E.
    Desmond Cullimore, P.E.

    513-870-6680
    614-227-4837

    mevans@bricker.com
    dcullimore@bricker.com

    Townships

    Kimberly Brown, Esq.
    Benjamin Hyden, Esq., B.S.C.E.
    David Riddle, P.E.

    614-227-8894
    513-870-6575
    614-227-8814

    kbrown@bricker.com
    bhyden@bricker.com
    driddle@bricker.com

    Libraries

    Sylvia Lynn Gillis, Esq.
    Scott Davis, Esq., B.S.C.E.

    614-227-2353
    614-227-4879

    sgillis@bricker.com
    sdavis@bricker.com

    Overall Coordination

    Sylvia Lynn Gillis, Esq.
    Michael S. Holman, Esq.

    614-227-2353
    614-227-2348

    sgillis@bricker.com
    mholman@bricker.com

     

    Special Features

    The Ohio School Facilities Commission has recently amended the Ohio School Design Manual to provide for solar-ready schools
    Ohio School Facilities Commission Adds Solar Panels to School Design Manual

    Visit our special topical resources
    Construction Resource Centers

    Construction Legislation Enacted in the 127th Ohio General Assembly
    Construction Legislation

    Join the Bricker & Eckler Construction
    Fellowship program

    Doing business with the State of Ohio or its various cities, counties, and localities? Visit our resources for assistance
    Government Contracting and Procurement

    Upcoming
    Construction Seminars
     


    Newsletter

    Read our latest issue of Brickerconstructionlaw.com
    December 2008 Newsletter

    Read past editions of Brickerconstructionlaw.com & ohioconstructionlaw.com

    Subscribe to Brickerconstructionlaw.com
     

     

    Copyright 2005-2009, Bricker & Eckler LLP, all rights reserved.  Please read our Privacy Notice.
    The words Bricker & Eckler and its logo are registered trademarks of Bricker & Eckler LLP